Welcome To Hunan Kaite Electric Power Technology Co., Ltd.!

Specialized production of power transformer enterprises

Set up a suitable option for your power equipment

07302332888

Welcome to inquire

Hot key words:Box substation,Dry type transformer
Contact
Hunan Kaite Power Technology Co, Ltd.
Hotline:0730-2332888
Aftermarket hotline:0730-2332889
CEO Mr Zhang:13807408079
CFO Mr Yang:13874055777
Email:hnkaitedianli@163.com
Contact Address:Wenxing Town Industrial Park, Xiangyin County,Yueyang,Hunan Province,China 

Industry News

current location:Home > News > Indust...

Understand box-type substation installation and maintenance

author: Baidu Wenku source: Baidu Wenku
  Box-type substations shall comply with the requirements of the electric power department in terms of installation, acceptance, handover testing, commissioning, operation and maintenance. Should also pay attention to the following matters: The user should carefully check the receipt of goods in accordance with the relevant provisions, for products not immediately installed, should be stored in the appropriate place according to the normal conditions of use. The product should be lifted at the bottom of a special spreader. The product level is placed on the basis of prior work, and four anchor bolts are installed (secondary irrigation method is available). Then, the gap between the product base and the foundation is sealed with cement sand to prevent rainwater from entering the cable compartment. The high and low voltage cables are connected to the bottom plate of the high and low pressure chambers. The gap between the cable and the pipe is sealed and waterproof. On the high-voltage side of the box-type substation, either the overhead line or the cable entry line should be provided with clearly visible fractures (such as drop-type fuses) on the high-voltage side line near the substation. In this way, it is clear to the maintenance operator whether the substation is charged. To ensure the safety of maintenance operators. After the product is installed in place, it should be grounded reliably: the two main earthing terminals on the channel steel of the power station, the neutral point of the transformer and the shell, and the pile header of the arrester should be grounded directly by the installation department. The grounding should share a group of grounding devices, and the grounding resistance should be less than 4 ohms. The grounding lead from the grounding grid to the product should be no less than two. After the box-type substation is installed or repaired, it should be tested and tested as follows before putting it into operation. After the product is installed or repaired, the following inspections and tests shall be conducted before the product is put into operation. Is the substation clean? Is the operating mechanism flexible? The main appliances are flexible and reliable. Whether the electrical auxiliary contact is on or off is reliable and accurate. Metering and relay operation are accurate. Instrument and transformer ratio and polarity of wiring are correct. Whether all electrical installation nuts are tightened and the installation is solid and reliable. Busbar connection is good, it supports insulators, clamping parts are installed reliably. Whether the setting value of the electrical appliance meets the requirements and whether the fuse fused specification is correct. Whether the contacts of the main circuit and the auxiliary circuit meet the electrical schematic requirements. The resistance of the product's internal protective grounding system should be less than 0.01 ohms. Each part shall be tested for withstand voltage in accordance with the appropriate voltage level. All components in the box substation are maintained according to their respective specified technical requirements. If the selected transformer is oil-immersed, at least one oil sample analysis inspection shall be conducted every year as required. After the high-voltage switchgear is in operation, after 20 times load or 2,000 no-load closing and closing operations, the contact condition and the degree of loss of the arc extinguishing device should be inspected, and an abnormality should be repaired or replaced in time. After the low-voltage switchgear is tripped automatically, the cause of the tripping should be checked and analyzed. After waiting for queuing failure, it can be restarted. Arresters should undergo a preventive test each year before the thunderstorm season. When repairing high-voltage switchgear or overall maintenance, the substation incoming power must be cut off.
Hunan Kate Electric Power Technology Co., Ltd.,Box substation,Dry type transformer
07302332888
Copyright:Hunan Kaite Electric Power Technology Co., Ltd.
Technical support:JING WANG ZHI YING Inspection of business license 

Contact

Hunan Kaite Power Technology Co, Ltd.
Hotline:0730-2332888
Aftermarket hotline:0730-2332889
CEO Mr Zhang:13807408079
CFO Mr Yang:13874055777
Email:hnkaitedianli@163.com
Contact Address:Wenxing Town Industrial Park, Xiangyin County,Yueyang,Hunan Province,China 

Scan QR code

Scan

07302332888

Scan

QR code